Building Permits

 

WHEN DO YOU NEED A BUILDING PERMIT?

BUILDING PERMIT APPLICATION (Online portal)

FEES:

    • A completion deposit will be required at the time a building permit is applied for based on the total cost of the project. This deposit will be refunded once the project is completed and all codes have been complied with.
    • All fees must be paid in full before a building permit will be issued.
    • Building permit fees
    • Park fees

BUILDING INSPECTOR INFORMATION:

    • You may reach the inspector, Aaron Holbach at (608) 617-3566 or by email at aholbach@generalengineering.net  during regular business hours for questions or information.

Once the permit is issued it shall be posted at the job site in a visible location from the street.

The town office also “permits” razing and moving of buildings and requires erosion control. Call for more information.

PENALTY

Anyone who violates this code shall, upon conviction, forfeit not less than $25.00 nor more than $1,000.00 for each day of non-compliance, together with the cost of prosecution.

*Before a building permit can be issued for a new building, you will need to obtain a Land Use Permit (aka Zoning Permit) from General Engineering Company.